NewIntroducing the Vexum advisory boardRead the announcement
A technician testing an electrical panel with a multimeter

Maintenance work with lockout enforced and every reading kept.

Vexum runs your preventive and breakdown procedures step by step, requires the lockout steps and keeps every reading on the record with the machine it belongs to.

Maintenance procedures, worked step by step.

Preventive maintenanceBreakdown repairLockout and tagoutSpindle serviceCalibrationLubrication routesEquipment start-up
Work it

Lockout first. Then the work.

The lockout step is required, so nobody reaches the service steps without it. Vexum pulls the machine’s history and compares each reading to its limit.

  • Required steps can’t be skipped
  • Readings compared to limits as they’re entered
  • The work order drafted for a person to close
Maintenance icon
Spindle serviceMill 4 · due today, 12:00
In progress
  1. Apply lockoutRequired · M. Ito, 09:04Operator
  2. Pull machine history3 prior work ordersAutomated
  3. Measure runout0.004 mmOperator
  4. Compare to limitWithin 0.005 mmAutomated
  5. 5Adjust or replaceWaiting for M. ItoAssisted
  6. 6Close work orderDrafted for sign-offDrafted
Lockout recorded before any service step opened.
Ask

Answers from your manuals, history and systems.

Ask whether this has happened on this machine before and get an answer with its sources: past work orders, the maintenance log and the page of the manual.

  • Every answer cited
  • Gaps flagged, never guessed
  • Asked from inside the step you’re on
Spindle serviceStep 5 · Adjust or replace
Live
Has Mill 4 had runout problems before?
Twice this year. In March the spindle bearing was replaced after runout reached 0.009 mm. In June runout was 0.006 mm after a tool crash and was corrected by re-seating the tool holder.
Work order 1184Work order 1302Maintenance logSpindle manual, p.42
Train on it

What your best technician knows, built into training.

Training is built from the procedure and from how your experienced people actually did the job, then assigned by role, shift or location.

  • Built from real work orders
  • Worked step by step on a past case
  • Completion tracked for every version
Spindle service trainingReal case from March · 2 of 4
Measured0.009 mm
Limit0.005 mm
What do you do next?
Re-seat the tool holder and measure again.
Keep running and check at the next PM.
Lock out and inspect the spindle bearing.

Right. Above 0.008 mm the procedure calls for a bearing inspection.

Using a tool like this to recognize tribal knowledge is a much better approach than asking people to stop relying on it.
Co-Owner and PresidentIndustrial automation and machining group50+ employees
A large empty factory hall

See Vexum on your own procedures.

Tell us about your operation and our team will reply within one business day.