NewIntroducing the Vexum advisory boardRead the announcement
A worker reviewing large sheets on a table in a workshop

Every engineering and supplier change, traced to everything it touches.

Vexum shows every procedure, part, supplier and training a change affects before anyone approves it, then publishes the new version everywhere at once.

Engineering and supplier change procedures, worked step by step.

Engineering change ordersDrawing revisionsSupplier change noticesDeviation requestsFirst article inspectionPPAP submissionsSupplier onboarding
Trace it

See what a change touches before you approve it.

Propose a change and Vexum finds every procedure, part, supplier and training that refers to it, across every location.

  • Procedures, parts and suppliers
  • Every location on one screen
  • Training that needs to follow
Engineering and supplier change icon
Change requestBracket 4471 · Rev C to Rev D
In review
Bore 12.00 ±0.05 mmBore 12.00 ±0.03 mm
What it touches
Procedures
Customer complaint handlingIncoming inspectionCMM program 4471
Parts
Bracket 4471
Suppliers
1 casting supplier
Training
Containment training
Approve it

Your approval route, with every signature recorded.

The change follows the route you set for it. Each approver sees what it touches, and every signature is on the record.

  • Routes set per procedure or change type
  • What it touches, shown to every approver
  • Signatures kept in the audit trail
Incoming inspectionv5 to v6
In review
Step 3 · Measure bore diameter
WasMeasure the bore on 5 parts per lot. Limit 12.00 ±0.05 mm.
NowMeasure the bore on 5 parts per lot. Limit 12.00 ±0.03 mm to Rev D.
Reason

Drawing change, Bracket 4471 Rev D.

Approval route
DEDesign engineerApprovedQMQuality managerWaitingSQSupplier qualityWaiting
Publish it

Live everywhere at once. Nobody works from the old revision.

When the change is approved, the new version goes live in every location at once. Old versions are kept, and people trained on them are flagged.

  • Live everywhere at once
  • Old versions kept, never overwritten
  • Retraining flagged automatically
Incoming inspection · v6Approved by quality and supplier quality
Approved
ToledoUpdate to v6
MonterreyUpdate to v6
GreenvilleOn v6
History
v6v5v4v3

8 people to retrain. Trained on v5. Their managers have been told.

It’s too big for the human mind to absorb. Unless one person wrote the whole QMS, nobody in the organization knows how all the pieces fit together. This can do that for you, and that is very, very cool.
Director of Product FulfillmentAutonomous robotics manufacturer100+ employees
A large empty factory hall

See Vexum on your own procedures.

Tell us about your operation and our team will reply within one business day.